Unrealised proposal2026 · Iei — Memorial Portrait

After Letting Go

  • Sculpture
  • Participatory art
  • Public art

Hand-formed model, mineral casting compound and a metal armature

A proposal transferring the pressure of hands gripping a soft model into a hard sculpture. Contours left after those hands depart would remain available to hands arriving at another time.

AI-generated concept study. Form, figures, setting and impressions are illustrative; no public forming session or installation has taken place.

Image detail

Leaving a present grip for a hand arriving later

Hands would grip a soft model at the proposed display position. The pressure would be transferred into a hard form and returned to the same position, height and orientation. After the hands have let go, palm compressions and broad finger channels would remain available to a body arriving later.

A short invitation would explain that a hand gripped a soft model here and offer voluntary contact with the retained hollow. Visitors could instead look at the form, shadow and water. Neither touching nor a prescribed emotional response would be required.

Joining three modelling areas into one continuous form

Working dimensions are approximately 1.8 m long, 0.85 m high and 65–85 mm in outer diameter. Three roughly 60 cm modules would each contain an approximately 18 cm modelling area, connected by reusable rigid profiles. Variation in grip position and pressure would remain, including at least one clear palm-width compression and broad finger channels.

Room-temperature sulphur-free modelling clay would be supported by a metal core. Flexible moulds and rigid shells would transfer its contours into an outdoor mineral casting compound such as AC730. A separate metal armature would carry primary loads, with a fine matte surface and rounded transitions.

AI-generated study of gripping, letting go and later contact. It is not a record of physical mould-making or touch tests.

Image detail

Placement within continuing waterfront use

The proposed setting is a waterfront at Lendhafen where passing, staying and play continue. An independent sculpture would sit inland and parallel to the water, without replacing existing safety arrangements. Its precise position requires review of current use, ground, routes and permissions.

Placement would preserve benches, trees, ball games and waterside passage, with approach between low supports and around the ends. Ground firmness, level, seated reach and measures addressing lifting or overturning require site review.

From public formation to returning a hardened surface

A roughly ninety-minute formation session is proposed with the artist and a paid local assistant. Participants could grip the three modelling areas, including areas that overlap other pressures, with the artist’s grip also present. Photography consent would be separate, and requests not to use a section could be addressed before casting.

The proposed sequence is site recheck and formation, supported indoor mould-making, casting the three modules, at least twenty-four hours of initial curing in a warm dry space, assembly and surface/structural/site inspection, then observation after opening. Weather delays would move later stages rather than shorten curing or inspection.

Contact during exhibition would need no electricity. Production requires an indoor bench, dry curing space, power and tools, water and waste collection, and safe movement of heavy supports. Dates, roles and exhibition conditions remain unagreed.

Full-size tests, inspection, removal and material recovery

Before travel, a roughly 30 cm full-size sample would test pressure response, shape retention, mould compatibility, casting, finish and joints. Technical review would determine shell thickness and retention, connections, ballast, public loads, fragment risks and ground protection. The work is unrealised and these properties are untested.

Paid weekly and post-weather inspections are planned. Damage would suspend contact with the affected part pending repair or removal. Material and wash water would be collected rather than enter the canal, followed by dismantling, recovery of reusable parts, retention or disposal of casts and reinstatement. Responsibilities, insurance and removal roles require agreement before production.